Karst Ltd. carried out numerous geotechnical works, among which significant projects have been selected:

 

2018.

  • Construction of the residential-business building, swimming pool and retaining walls on the c.p. no. 1030/8, c.m. Veprinac, Opatija, Nova Cesta 131, street M. Tita 218, Excavation pit protection, ZAGREBGRADNJA d.o.o.
  • Excavation pit protection for the structure: ”Construction of the hotel complex Costabella – 1. Stage – excavation pit protection, demolition, excavations, beach filling, accompanying works”, Execution of anchors, weep holes, protection with netting and shotcrete, GP KRK d.d.
  • Geotechnical works on Hotel Adriatic project, Opatija, Execution of piles, anchors, weep holes, protection with netting and shotcrete, “MDK” GRAĐEVINAR

2017.

  • Residential business building TKALČIĆEVA 73 – Zagreb, Excavation pit protection and foundation works, HORTUS SOLIS d.o.o.
  • Long term pumping test in the area of Rakovice, Pumping test, HRVATSKE VODE (Croatian waters)
  • Residential building PRERADOVIĆEVA 11 ̶   Zagreb, Excavation pit protection and deep foundation, PP INVEST d.o.o.
  • Works on preparation of the engineering geological map of Podsljemenska (the below Sljeme hill) zone of the City of Zagreb, II phase, Investigation drilling works and investigation testing, GEOTEHNIČKI STUDIO d.o.o.
  • Summer cinema Tuškanac, Execution of wooden micropiles, FOTON PROMET D.O.O.
  • RAKOVICA- continuation of water investigation works – investigation drilling, HRVATSKE VODE (Croatian waters)
  • Construction works – excavation pit protection at the location of MALI RAJ in OPATIJA, MDK Construction, trade, services and agriculture
  • RDF Plant, Execution of micropiles for foundation, NEXE GRADNJA d.o.o.
  • Landslide Hrvatsko – Ložac – drainage and inclinometers, TRG d.o.o.
  • Execution of new piezometers and widening of the existing boreholes and installation of piezometers at the location of Terminal Omišalj – Janaf d.d., GEOTEHNIČKI STUDIO d.o.o.
  • Industrial zone Rakitovec by Velika Gorica – production plant for technical gases – Execution of investigation – exploitation well B-2, with obtaining water regulation conditions, water confirmation and permit, ISTRABENZ PLINI d.o.o.
  • Construction of the production – business building Vincek, Excavation protection and protection of adjacent structures, TERRA PLANT d.o.o.
  • Piezometric field JM-28-1, Prudinec/Jakuševec, Zagrebački holding d.o.o.

 

2016.

 

  • Phase of water investigation works at the area of Trpanj – wellspring Orah, Water investigation works, HRVATSKE VODE (Croatian waters)
  • Construction works – excavation pit protection at the location of HOTEL GORGIO II in IČIĆI, MKD Construction, trade, services and agriculture
  • Execution of works for LANDSLIDE REMEDITAION IN THE COMMUNITY OF PELESKI-DOBRI ZDENCI, MB-TRANSGRADNJA D.O.O.
  • Karlovac – wellspring Mostanje, Investigation drilling, VODOVOD I KANALIZACIJA
  • Execution of geotechnical works for REMEDIATION OF THE LANDSLIDE ON THE SLJEMENSKA ROAD, LAY-BY 65, CITY OF ZAGREB
  • Execution of works for LANDSLIDE REMEDITAION IN THE COMMUNITY OF BRASLOVJE, MB-TRANSGRADNJA D.O.O.
  • Slatinski Drenovac – execution of investigation-piezometric borehole at the location Slatinski Drenovac, Water investigation works, HRVATSKE VODE (Croatian waters)
  • Execution of part of the works for construction of the bridge Odra in Sisačko-moslavačka county, deep foundations, EDING d.o.o.
  • Works on REMEDIATION OF THE LANDSLIDE ON BLAGUŠKA ROAD IN BLAGUŠA, SESVETE, PRIGORAC-GRAĐENJE d.o.o.
  • Execution of project works on the supply melioration canal Biđ Bosut, EURCO d.d.
  • Exploitation field Vranović, Investigation drilling with coring, NAŠICECEMENT D.D.
  • Seget Donji – preparatory works for construction of the Healthy living center (Centar zdravog življenja), Execution of anchors and protective netting, VDM PROMET d.o.o.
  • Geotechnical investigations through strategic boreholes – locations T-2 and L-1, Geotechnical investigation drilling, GEOTEHNIČKI STUDIO d.o.o.
  • Execution of wells diameters of 1200mm for the “Arrangement of the hydrophore plant at HPP Varaždin“, VODOGRADNJA d.d.
  • Works on the building Villa Magdalena Krapinske Toplice, Excavation pit protection and deep foundation, GIC GRADNJE d.o.o.
  • Reconstruction of the piezometric system on the embankments of HPP Varaždin, Water investigation works, HEP-PROIZVODNJA d.o.o.

 

2015.

 

  • Ravni Kotari-Bukovica – continuation of the water investigation works, HRVATSKE VODE
  • Water investigation works in the Municipality of Trpanj, Execution of investigation borehole, IZVOR ORAH d.o.o.
  • Residential building JORDANOVAČKI ODVOJAK-Zagreb, Excavation pit protection, ALFA STAN JORDANOVAC d.o.o.
  • Execution of investigation works on the plateau of the II. unit of Terminal Omišalj, GEOKON-ZAGREB d.d.
  • Execution of investigation works in the port area of Slavonski Brod Port, phase III., GEOKON-ZAGREB d.d.
  • Construction of the building “C” and completion of the remaining part of the tunnel to its purpose “T” PHASE, Excavation pit protection, TRAG d.o.o.
  • RAB – INVESTIGATION DRILLING, HRVATSKE VODE
  • Execution of works for Croatian veterans center (Dom hrvatskih veterana) – Lipik, execution of piles, monitoring, geotechnical supervision and foundation grouting, HM-PATRIA d.o.o.
  • Water investigation works for the location Striježevica – execution of structural-piezometric boreholes, TEKIJA d.o.o.

 

2014.

 

  • Works to provide additional water supplies on the Island of Rab, drilling, water investigation works, VRELO d.o.o.
  • Works to provide additional water supplies at the area MARČANE, drilling, water investigation works, VODOVOD PULA d.o.o.
  • Reconstruction of the state road D29, section 21, Marija Bistrica – Kašina (Laz), drilling of micropiles, MEĐIMURJE GRADITELJSTVO d.o.o.
  • Remediation of the Landslide Zelengaj in Zagreb, execution of piles and geotechnical anchors, PRIGORAC-GRAĐENJE d.o.o.
  • Remediation of the Landslide Zvečaj, execution of piles, gabion walls, self-drilling drainage, HŽ INFRASTRUKTURA
  • Execution of works on the supporting structure at the mast no. 3 on DV 110 kV Pokuplje-Dubovac-Švarča, execution of piles and geotechnical anchors, Croatian Transmission System Operator Ltd. CROATIAN TRANSMISSION SYSTEM OPERATOR Ltd., Transmission Area Zagreb

 

2013.

 

  • Underwater blasting, Port of Gaženica, Zadar, drilling, GEOTEHNIČKI STUDIO d.o.o.
  • Upgrading the existing track and building a new two-way track on the railway section Hrvatski Leskovac – Karlovac, investigation works, GEOKON – ZAGREB d.d.
  • SYNTHESIS SM2 – UPGRADE OF THE API PLANT Savski Marof, Excavation pit protection, TEHNIKA d.d.
  • ACCUMULATION PONIKVE DAM – Krk, Construction of the grout curtain, PONIKVE KRK d.o.o.
  • Remediation of the Landslide Kvaternikova-Divoselska, VODOPRIVREDA ZAGREB d.d.
  • Drežničko polje, Water investigation works, CROATIAN GEOLOGICAL SOCIETY

 

2012.

 

  • CONSTRUCTION PROJECT PORSCHE RIJEKA – newly built garage with special purpose, excavation and excavation slope protection, PORSCHE ZAGREB d.o.o.
  • HALL XII. ŽITNJAK, Excavation pit protection, TEHNIKA d.d.
  • Remediation of the landslide with pre-stressed geotechnical anchors for the residential business building “DUNJEVAC”, Sv. Duh in Zagreb, TEHNIKA d.d.
  • Installation of bar anchors for the reconstruction of the railway section Lokve – Drivenik, PRUŽNE GRAĐEVINE d.o.o.
  • Atlant business center, Dubrovnik, Self-drilling anchors, ZAKLADANI STAVEB A.S. BRANCH OFFICE ZAGREB

 

2011.

  • Temporary geotechnical anchors, Sv. Kuzam-Križišće, VIADUKT D.D.
  • Excavation pit protection for residential building Z4 and Z5 – Sv. DUH, ZAGREB, execution of piles and anchors, SGZ STANOGRAD
  • Protection of the railway tunnel “KALVARIJA”, execution of anchors, protection with shotcrete, measuring and monitoring with inclinometers and deformeters, PRUŽNE GRAĐEVINE d.o.o.
  • COMMERCIAL CULTURAL CENTER IN SESVETE between Bjelovarska street and railway track (on c.p. 1851/1, c.m. Sesvete) in Sesvete, execution of piles for foundation soil improvement, V.D.M. PROMET d.o.o.
  • Business center Heinzelova, Zagreb – excavation pit protection, KAMGRAD d.o.o.

 

  • Preparation of the main design for the excavation pit protection and execution of the excavation pit protection for the underground basement floor at ZSPG B (M16) – Livadarski put, Zagreb, STIPIĆ GRUPA d.o.o.
  • Remediation of the landslide Veliki potok, execution of piles and shotcrete, TIGRA d.o.o.
  • VILLA DUBROVNIK – Slope stabilization at dilatation “D”, execution of anchors, HOTEL VILLA DUBROVNIK d.d.
  • RESIDENTIAL BUSINESS BUILDING ZAGREBAČKA 1, Excavation pit protection, execution of steel sheet piles, driving of steel profiles, execution of geotechnical anchors, IZGRADNJA d.o.o.
  • Excavation pit protection for residential buildings Z4 and Z5, Sveti Duh, driving of steel profiles, execution of micropiles and anchors, S.G.Z. STANOGRAD housing-building cooperative
  • Business building Vukovarska, Zagreb – execution of geotechnical anchors, KAMGRAD d.o.o.

 

2009.

  • Geotechnical investigation works for the underground garage bellow HNK (Croatian National theatre), Zagreb, Geotehnički studio, Zagreb
  • Foundation remediation for the Franciscan monastery using micropiles, Kraljeva Sutjeska, B&H, Franciscan monastery of St. John the Baptist, Kraljeva Sutjeska, B&H
  • Foundations on CFA piles for a crane, residential center “Zvonimir”, Zagreb, Croatia, Tehnika Co., Zagreb
  • RESIDENTIAL BUSINESS BUILDING, Heinzelova – branch, Zagreb, Croatia, F.K.T., Ivanićgrad
  • Slope stabilization with anchored and gravity wall for the hotel Villa Dubrovnik, VILLA DUBROVNIK
  • Ministry of Internal Affairs – Savska street, Zagreb, Croatia, Excavation pit protection with anchored piles, anchored shotcrete, KAMGRAD
  • Slope stabilization by consolidation grouting, anchored micropiles and drilled drainage under the railway in Buzet, Croatia, PRUŽNE GRAĐEVINE, Zagreb
  • Plat, Dubrovnik, landslide remediation, ZAKLADANI STAVEB

 

2008.

  • Investigation drilling for the Heating plant, Zagreb, Croatia, TOPLANA ZAGREB
  • Investigation drilling for the ski resort “Sljeme”, Zagreb, Croatia, CITY OF ZAGREB
  • Foundation piles for the business residential center TIZ, Zadar, Croatia
  • SPC Maksimir – Kišpatićeva, residential – business center in Zagreb, excavation pit protection, GEOTEHNIKA INŽENJERING, ZAGREB
  • Business building Raiffeisen Bank – Magazinska street in Zagreb, excavation pit protection, KAMGRAD
  • Residential – business center “Sky Office” in Zagreb, excavation pit protection, TEHNIKA
  • Wadi Dayqah Dams Project in Oman – management of works on the grout curtain, BAUER SPEZIALTIEFBAU GMBH, Germany
  • Baglihar Hydro-Electric Project; India; contact and consolidation grouting of the supply tunnel, JAI PRAKASH ASSOCIATES LIMITED, India

 

2007.

  • Investigation drilling for the HPP “Ličko Lešće”- Croatia, HEP, Zagreb
  • Investigation drilling for the Shopping Center in Zaprešić; Croatia, ATP Austria
  • Foundation piles for the abutments of the bridge over the Vuka river, Vukovar, Croatia, HRVATSKE CESTE (Croatian roads)
  • Buzet IV – slope stabilization with drilling and grouting, HRVATSKE ŽELJEZNICE (Croatian Railways)

 

2006.

  • Public underground garage Ilijina Glavica in Dubrovnik, excavation pit protection, CITY OF DUBROVNIK
  • Maritime school in Bakar, excavation pit protection, BAKAR TOWN
  • Bijenik, Zagreb, landslide remediation, HIDROCOMMERCE, Zagreb
  • Kvaternikova street, Zagreb, landslide remediation, HIDROCOMMERCE, Zagreb
  • Črešnjevec, Zagreb, landslide remediation, CITY OF ZAGREB

 

2005.

  • Investigation drilling for the hotel “Villa Dubrovnik”, Croatia, VILLA DUBROVNIK
  • Foundation piles and excavation pit protection for the rehabilitation center “Topusko”, Croatia, HEALTH RESORT “TOPUSKO”
  • Center PC 2000 in Zagreb, excavation pit protection, OKTAVIJAN, Zagreb,
  • Zagreb tower Center, excavation pit protection, ZAKLADANI STAVEB
  • Business center Almeria in Zagreb, excavation pit protection, PORR CROATIA

 

2004.

  • Investigation drilling for the sports hall “Višnjik”, Zadar, Croatia, CITY OF ZADAR
  • Geotechnical investigation drilling and installation of piezometers, the lower stream of Neretva river, Opuzen, Croatia, OPUZEN TOWN
  • Grmošćica, Zagreb, landslide remediation, HIDROELEKTRA NISKOGRADNJA, Zagreb
  • Policentro Rijeka, Croatia, landslide remediation, GP KRK
  • Ponikve dam on the island of Krk, grout curtain, PONIKVE, Krk

 

2003.

  • Investigation drilling for the main port – Gaženica, Zadar, Croatia, PORT OF ZADAR
  • Investigation drilling for the reconstruction of the Gruž port in Dubrovnik, PORT OF DUBROVNIK
  • Excavation pit protection for the underpass of Čulinečka street under Branimirova street and the railway in Zagreb, by anchored piles, rock bolting and soil nailing, CITY OF ZAGREB
  • Landslide Draganić, anchored piles, CROATIAN RAILWAYS
  • Draga II – Rijeka, anchored reinforced-concrete structure, CROATIAN RAILWAYS
  • Reconstruction of the seafront “Mali mul” in the port of Dubrovnik, drilling and grouting, CITY OF DUBROVNIK
  • Supervision over grouting works for the Mujib dam, Jordan, LAHMEYER INT. GMBH, Germany

 

2002.

  • Excavation pit protection for the underpass of Zagrebačka street under the railway track in Zagreb, CITY OF ZAGREB
  • Krešimir Center; Zagreb, Excavation pit protection, TEHNIKA
  • Landslide Buzet, anchored piles, CROATIAN RAILWAYS

 

2001.

  • Draga II – drilling and grouting of the rock mass, GP KRK

 

2000.

  • Investigation drilling on the motorway Zagreb – Dubrovnik, section Bosiljevo – Josipdol, “IPZ”, Zagreb
  • Warehouse within the factory KRAŠ in Zagreb, Execution of piles, KRAŠ d.d.

 

  1. – 1989.
  • Investigation drilling on the motorway Zagreb – Goričan, “ASTALDI”, Italy
  • Nairobi/Kenya – installation and testing of pre-stressed anchors for the excavation pit, BAUER SPEZIALTIEFBAU GmbH
  • Toker Storage Dam; Asmara/Eritrea; drilling and grouting, and installation of instruments for geotechnical monitoring, BAUER SPEZIALTIEFBAU GmbH
  • Piles of 400 mm diameter for the annex of the hotel “Corynthia” in Baška on the island of Krk, CONING, Budapest
  • Execution of drilled drainage system on the motorway Rijeka-Zagreb, landslide Bajer-Vrata, HRVATSKE CESTE (Croatian roads)
  • Drilling and grouting for the diversion tunnel of the Godar-e-Landar dam; Khuzestan/Iran, ILBAU Gmbh, Austria
  • Investigation drilling for the TPP “Jertovec”, Croatia, HEP – Zagreb